on 09-03-2014 4:21 AM
Hi,
I had performed GR from Purchase Order of 90kg. (Material Document with movement 101 with 90kg and Inspection Lot generated)
Later performed Adjust Quantity in Insp. Lot at QAC1 to 100kg. (Material Document with movement 101 with 10kg generated and quantity added to Insp Lot)
UD is performed with 100kg
I would like to cancel 100kg from inventory due to some reason(wrong quantity entry n etc.)
Thus, I performed UD reversal with OSS note program.
I performed cancellation of material document at MIGO.
The issue start here.
The material document cancelled but only consists of 90kg
I'm not able to cancel material document of 10kg.
Hit an error as following
Change the inspection stock of material in QM only
Fyi, previously use return delivery (movement 122). Now management does not allow due to it is not a return.
May I know how can I remove 10kg from inventory?
Thanks in advance.
Regards,
William Lee
Hi,
This issue been raised to SAP. I will keep it posted once there is a solution.
Thanks.
Rgds,
William L.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
1) You may have no choice put to post the 10KG from QI to blocked stock or unrestricted and then write the material off from there.
2) There is an OSS note available for reversing UD's. You might try that and then try the QAC1 adjustment. That would leave a lot qty of zero. I'm not sure the system will like that.
3) You might try reversing the reversal of the original 90 kg and put it back to the inspection lot which will give you 100Kgs again. Then do QAC1 again and adjust back to 90. Then do the reversal again which hopefully will make the lot go to 0 and status LTCA.
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello William,
Usually if you change the qty after GR, best way to do another GR for remaining qty without using QAC1 to avoid this issue. In your case, as you performed GR first for 90 kGs and you used QAC1 directly yo increase 10kg, instead if you could have done one more GR for remianing 10kg, system would have triggered another inspection lot where it allows you to cancel both the material documents. But I agree QAC1 is meant for changing the qty but only for lot not for GR though.
Does it makes sense ?
Now to resolve your issue, execute QAC1 again and remove the 10kg qty from actual qty(keep it blank) and save the transaction. It may pop up some warning and you can just force it. In this way, the remaining 10kg will wipe off from the QI and you can lock the lot not to use it anymore.
Hope this helps.
Regards,
Prakash
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
First of all 10kg is additional qty which you have added in existing inspection lot of 90 kg.
First cancel the Material document of 10kg. and then take the reversal of whole lot. or Via OSS note system will only remove 90 kg and remaining you need to take out by using 0800 for 10kg.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Shailendra,
Even i tried to cancel the Material Document of 10kg first and the same error prompted.
" Change the inspection stock of material in QM only "
If you're referring to OSS note "48815 - Checking possible inconsistencies between MM and QM".
Well,it does not work.
Thank for your reply.
Regards,
William Lee
Hi Natalia,
All this while, I been using MIGO and MBST to do material document cancellation.
No issue in cancelling material document of 90kg.
However, material document of 10kg prompted the mentioned error.
" Change the inspection stock of material in QM only "
Thanks for reply.
Regards,
William Lee
Hello,
See system will allow you to take the decision back fro 90 KG. Then just activate 0800 inspection type for remaining 10 kg in MM- QM view and via QA01 create inspection lot by using this inspection type and take it back from QI stock to UNRES. as i suggested you in my earlier thread.
Regards
Hi Shailendra,
After performed UD reversal and cancelled material document of 90kg, I created Insp Lot with Insp Type 0800 of 10kg (QA01) using the same batch and storage location. However, the Insp Lot 0800 created is a non-stock relevant. Thus, there is no stock posting for the Insp Lot 0800.
Please advise if I miss any of the step.
Thanks.
Regards,
William Lee
Hi William, I'm just putting a though here!
Now from here the next steps should be,
Hi Shailendra,
QA08 does not work. When execute QA08, message "No entries found".
I found that to trigger inspection lot 0800, the material should not have any inspection type activate.
However, for my case, the material has been activated with several inspection type such as 01 and 89.
Hi Anand,
After UD reversal, system does not allow to access QAC1 because Inspection Lot have "UD-usage decision has been made" status.
Thanks to both for your reply.
All in all, all the methods mentioned above does not solve the issue I faced. Any other suggestion is most welcome.
Regards,
William Lee
Hi Ntn,
I successfully triggered Inspection Lot 0800 for QI stock when the Material does not have any Inspection Type activation.
When the material is activated with any Inspection Type, I can no longer trigger any Inspection Lot 0800 using QA08 and I have message "No entries found". This is tested.
Thanks.
Regards,
William Lee
Hi Ntn,
From your print screen, your steps is correct but is not complete.
My objective to remove 100kg from inventory.
Continue from your steps at UD reversal (322 movement type).
I successfully cancel material document of 90kg (102 movement type) using MIGO but the remaining 10kg hit error.
So, I'm looking for a solution to remove the remaining 10kg.
Regards,
William Lee
Yes Correct ! You basically need further reversal (after UD reversal) for the 90 Kg and 10 Kg.
As far as I know, you can't correct the quantity using QAC1 incase UD is made (you already mentioned that).
Even going for 08 inspection lot won't make it and result in following issues,
I think you are left with only one option. Convert it to Scrap. I'm not sure if that's allowed or feasible into your business. Or else, wait until you get a solution before raising it to SAP.
ntn
After UD reversal, system does not allow to access QAC1 because Inspection Lot have "UD-usage decision has been made" status.
Above issue because of your inspection lot status is UD (green color), shall use SAP note to reset back to REL (red color). Then you only allow to access QAC1 to reset the quantity.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.