on 08-16-2014 9:17 AM
Hi,
I have configured storage type Z930 (role:doors), z910 (role:staging area), z001 (high racks). I have used POSC - unloading, packing and putaway.
The inbound delivery item has determined the Z910 bin in the staging bay and Z930 in Goods movt. Also I have created HU for unloading purpose.
Now when I am clicking "Create WTs" in TU screen, below error screen is coming up. It is trying detect final ptwy bin (storage type: Z001) instead of door.
I have observed, if the final ptwy bin is available empty, then TU unload is working. But this is not the behaviour expected. Ideally it should unload to door.
Karthik
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
AS its POSC.
when you unload due to customization ( storage process ) system will also find final bin for product.
check putaway table for POSC indicator + WPT + Putaway sequence.
This table should have WH+PACI+WPT+putaway sequence and putaway rule .
check POSC seq table.
step one from door to grzone
step 2 gra zone to packing
step 3 packing to final bin
in storage process check
step one unload + packing and putaway.
check WPT and source bin and door determination rule.
Then when u unload system will create unload task and putaway task. as per POSC customization.
check storage type and its rule to find bins.
check bins like gr-zone,door, pack (WC bin) and all final bins.
Regards
Suraj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Suraj,
Sorry to reply late. I checked what you have mentioned, it is correctly configured.
My problem is that my WOCR rule which i have set at weight level, is failing as only single ptwy task is getting triggered instead of multiple task based on weight.
Example:
I am unloading 10 qty of 50kg each making it to 500kg at document level. My bin capacity is 100kg.
Since i am using POSC, i had to create a dummy HU for entire 10qty and then proceeded for unloading. I was supposed to re-pack at the workcenter after unloading. But what is happening is when the unloading task is creating the putaway task also created for single HU instead of applying WOCR.
Karthik
User | Count |
---|---|
6 | |
4 | |
4 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.