Hi,

I have requirement to move SAP ECC stand alone system to cluster environment.

OS - MS server 2003

DB - Oracle 10

What steps need to follow to perform this activity?

What down time required?

Please Help.

Regards

Amit

Accepted Solutions (0)

Answers (2)

Answers (2)

divyanshu_srivastava3
Active Contributor
0 Kudos

Hi Amit,

Please share source and target details.

Also, if your source and target OS are same, then you can install PAS on a new machine and connect this with the database.

Refer

Divyanshu

Former Member
0 Kudos

Hi Divyanshu,

Target OS /DB - Windows Server 2008/ Oracle 11 G

Current SAP ECC version is 5.0 and over all size in 600 GB.

Could you please brief about PAS installation an connection with database? If I keep target OS DB same.



Thanks and regards

Amit Dwivedi

divyanshu_srivastava3
Active Contributor
0 Kudos

I believe you can use homogeneous system copy for building you new CI(PAS) and DI(AS)'s can be installed directly on new servers. You have to take care of OS data which will we same for new system also, for eg, trans, host and services files etc.

divyanshu_srivastava3
Active Contributor
0 Kudos

And yes, time cannot be estimated verbally.

It all depends on system resources and not much data needs to be replicated, if you keep your database on same old host. ( which I have assumed in all my replies)

Perform this test of sandbox system to get ideas on issue and time that it takes, and then you can get a fair idea on the time required.

Divyanshu

Sriram2009
Active Contributor
0 Kudos

Hi Amit

1.  What is your target OS / DB?

2. What is the current SAP ECC Version details? over all db Size?

BR

SS

Former Member
0 Kudos

Hi Sriram,


Target OS /DB - Windows Server 2008/ Oracle 11 G

Current SAP ECC version is 5.0 and over all size in 600 GB.




Thanks and Regards

Amit

Sriram2009
Active Contributor
0 Kudos

Hi Amit

1. You have to perform SAP Homogeneous system copy method from soure to target

       Kindly refer the system copy guide

http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/00f3087e-2620-2b10-d58a-c50b66c15...

  refer the SAP note FAQ  112266

2. Before that check the PAM you present version supported Windows 20008 / Oracle 11 G?

refer the SAP link http://service.sap.com/PAM

3. Over all down time may be 20 hrs time

BR