Assigned Value Roll Up

former_member604117
Participant
0 Kudos

The assigned value did not roll up to the top WBS element.

The assigned value showing for 2nd and 3rd level wbs but not rolling up to 1st level.

The user did CJBW,CJBV,CJEN and CJBN no result.

PLs Guide


Accepted Solutions (0)

Answers (3)

Answers (3)

sushrut_sheth
Active Participant
0 Kudos

Dear John,

As per your requirement,

first carryout the following checks,

have you activated and configured the system correctly,

have you checked that the budgeting carried out is totalled up,if yes then at what levels are there multiple 1st level WBS elements.

then check the parent WBS element,if the Budgeting is carried out at the 2nd level WBS element or 3rd level WBS element then there is a possibility that your assigned value is not totalled up,it shall be restricted upto level at which budgeting is carried out

also please go through the post with assigned values

sanjeevc
Active Contributor
0 Kudos

HI,

whether you are able to see the project cost is not rollling up?

if this is plan cost cost in CJ40 then do F9 or by path Edit->totalup

Regards,

Sanjeev

Former Member
0 Kudos

Hi John,

Please be clear with your query. I am not able to understand what exactly you want and what you were trying to do. Please post some screen shot and tell me which transaction that you were using.?

Is that CJ30, CJ40 or something else.?

Regards,

Amit