on 08-05-2014 4:52 PM
Hi Experts,
We are facing an issue where daily MRP( SAP_MRP_001) run for a product at vendor location.
Pur req's are created on the daily run from Production planning Run.
Issue we are facing is MRP run is not deleting the past Pur req's and creating the pur req's accordingly.
But if i run the product heuristic the Pur req's do clear and it update accordingly.
MRP Heuristic is running with reuse mode - Use suitable reciept elements.
Any inputs on the issue please.
Regards
Maddy
Hi Maddy,
Please check the heuristic in the master data product, tab PPDS, section Procurement Planning, field Product Heuristic.
I think that they are not the same.
Also, check if the Pl.Orders are firmed. The firmed PL.Orders are not deleted.
In MRP_001 heuristic you can change the Reuse mode to Delete Unfixed Receipts (you will need to create a copy of the heuristic first).
Regards, Marius
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Marius,
I have checked the product in PPDS tab and the product heuristic field is empty.
And the pur req's are not firmed.
Can you please suggest i change the Re use mode to Delete Unfixed Reciepts it will delete the old Pur req's and will create new one's accordingly.?
Thanks in advance.
Regards
Maddy
Hi Maddy,
Yes. The infixed P.Req should be deleted by heuristic. This note explain very well the logic of Reuse Mode and Planning file entry in the heuristic ( SAP note 518556).
Regards, Marius
The reuse mode from the heuristic settings is determined as follows:
As already mentioned, MRP (SAP_MRP_001) calls another heuristic to plan another product.Here, the relevant reuse mode depends on the reuse mode of the MRP heuristic:if you leave the reuse mode of the heuristic as initial (blank) in the MRP heuristic, the reuse mode of the particular heuristic called by the MRP heuristic is relevant.If you have set another reuse mode in the MRP heuristic, then the reuse mode of the MRP heuristic is relevant. As of SAP APO 3.1 and SAP SCM 4.0, the following rule applies: if the reuse mode is set to 'Use suitable receipts', the reuse mode of the heuristic called by the MRP heuristic is relevant. If you have set another reuse mode in the MRP heuristic, this reuse mode is relevant to the MRP heuristic.
The following table shows which reuse mode (second column) the system uses for a given combination of reuse mode from the heuristic settings and reuse mode from the planned planning file (first column) for SAP APO 3.0:
Reuse modes from Reuse mode used in
planning file and production planning run
heuristic settings
0 and 1 1
0 and 2 2
0 and 3 3
0 and 4 4
1 and 1 1
1 and 2 2
1 and 3 4
1 and 4 4
2 and 2 2
2 and 3 4
2 and 4 4
3 and 3 3
3 and 4 4
4 and 4 4
The numbers represent the following reuse modes:
0 No details (as of SAP APO 3.1 and SAP SCM 4.0 in the heuristic settings 'Use suitable receipts')
1 Change planning (as of SAP APO 3.1 and SAP SCM 4.0
in the planning file 'Use suitable receipts')
2 Regenerative planning (as of SAP APO 3.1 and SAP SCM 4.0 'Delete non-fixed receipts')
3 Reexplosion of planning data (as of SAP APO 3.1 and SAP SCM 4.0 'Reexplode plan')
4 Reexplosion and regenerative planning (as of SAP APO 3.1 and as of SAP SCM 4.0 'Delete unfirmed receipts, reexplode fixed receipts') As of SAP APO 3.1 and SAP SCM 4.0, a slightly different merge rule applies for the reuse mode of the heuristic and reuse mode of the planning file entry. Refer to note 557731.
If there is no any planning file entry for a location product, the system uses the reuse mode from the heuristic for the planning run.Location products without a planning file entry are only planned if the indicator 'With Planning File Entry' is not set in addition to the other selection criteria for the processing step of the production planning run.However, in general, only products with a planning file entry should be planned.For this purpose, set the indicator 'With Planning File Entry' in the selection criteria.
Hi Marius,
We have SCM 5.1 system.
The indicator 'With Planning file entry' is not set in this case.
Also can you please calrify here we do not have any heuristic in product master PP/DS tab and MRP heuristic is not calling any other heuristic? or by default will it call the heuristic SAP_PP_002.
Regards
Maddy
Hi Maddy,
In this case the heuristic will use Reuse mode. So, the Reuse mode - Delete Unfixed Receipts (in SCM 7.2 in my system) is the good one. This is an regenerative plan. All unfixed receipts will be deleted and recreated.
There is a work around if you want. You can create a background job to delete the unfixed orders with the program /SAPAPO/DELETE_PP_ORDER. You have to specify the order category (e.g AG - Purch.Requisition) that you want to delete and the horizon. You create a variant where you define a dynamic horizon. With this variant you can create the job that will run before the heuristic.
Regards, Marius
Hi Marius,
MRP Heuristic with reuse mode 'Use Suitable Receipt Elements' is used as product heuristic.
when i try to run the product heuristic manually the Old Pur req's are getting deleted.
MRP is run from daily process chain.
For some products old pur req's are deleted and for some products these are not deleted.
Any inputs please.
Regards
Maddy
Hi Maddy,
In your process chain please double clicks in the step Production planning run. On the bottom of your screen you will have the steps that are defined for production planning.
Choose the step with heuristic MRP_001 run. I think that you have a selection for products.
Check if your products are in the selection. Check the other selections (prod.planner, etc.) maybe you have some exclude values. Also check time profile for MRP_001. Is the start date in the past?
If everything is OK, I propose you to delete them manually and see if in the future you will have the same issue.
Thanks.
Regards, Marius
Hi Maddy,
I think you are running the Heuristic SAP_MRP_001 from Tcode /SAPAPO/CDPSB0.
If yes, can you please check that 'With Planning File Entry' Box is not checked. If its checked then the system does only net change planning.
Remove this tick and then try to run the MRP. Please share the findings.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Maddy,
Kindly see the Tcode carefully--I have mentioned /SAPAPO/CDPSB0 . You can also run this Tcode in background through program /SAPAPO/BACKGROUND_SCHEDULING.
It is NOT CDPS0 (which is meant for Planning Board).
Having said that-- all I am suggesting is can you check in the variant which runs the Production Planning run whether 'With Planning File Entry' Box is checked or not. If its checked then the system does only net change planning.
Remove this tick and then try to run the MRP. Please share the findings.
Hi Maddy,
Can you tell me what planning procedure you have used in this case which has been assigned to your product.since you are using SAP_MRP_001 heuristic it will call the heuristic assigned in the product master and if there is no product heuristic assigned then it will used heuristic assigned to the planning procedure.
Following are the some of the procurement planning heuristics for which the reuse mode is relevant:
Name | Description |
SAP_PP_002 | Planning standard lots |
SAP_PP_003 | Planning shortage quantities |
SAP_PP_004 | Planning standard lots in three horizons |
SAP_PP_005 | Part period balancing |
SAP_PP_006 | Least-unit cost procedure (external procurement) |
SAP_PP_013 | Groff procedure |
SAP_PP_C001 | Planning standard lots for continuous requirements and receipts |
SAP_PP_SL001 | Planning standard lots with consideration of shelf life data |
Regards
Ashutosh shende
User | Count |
---|---|
7 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.