on 07-28-2014 4:48 PM
Hi, Expert:
In note 1305698 have below description:
------------------------------------------------------------------------------
When creating new material masters for materials subject to batch management and using
means that, for a material, the first batch is always created in the EWM system and must be
transferred to the EWM system because this creates the connection between material and class.
-----------------------------------------------------------------------------
I confused by this statement.
The first batch record should be created in which system, ERP or EWM?
The first batch is always created in which system, ERP or EWM?
BR.
Hi,
sorry, that is a typo in the english translation of the note. The original german says: "Dies bedeutet, dass zu einem Material die erste Charge jeweils immer auf ERP-Seite angelegt und an das EWM-System übertragen werden muss, da hierdurch die Verbindung zwischen Material und Klasse angelegt wird."
(now translated from me): This means that, for a material, the first batch is always created in the ERP system and must be transferred to the EWM system because this creates the connection between material and class.
I will ask for a correction.
Best regards
Juergen
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
9 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.