Does planned orders are really transffered from APO to ECC technically ??
Hi,
Think to these scenario. You have to different systems with two different plan order number range. How the pl.order number will be consistent?
Pl.Order number information flow: APO generate pl.order number XXXXXXXX. The pl.order is transferred on ECC side by CIF. The pl.order change the number to YYYYYYYY. The new number is transferred to APO by CIF.
Result: pl.order number is consistent on the two sides (ECC, APO)
Regards, Marius
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Marius,
The order number are the same in the APO and ECC system.
If the imodel is active and if you have maintained the Distribution Definition, then the same planned orders will be available in both: APO and ECC.
For example, if you delete the order in ECC, it will be automatically deteled in APO (after a few sec or even micro seconds). Same vice versa, if you delete the order in APO, it will be automatically deleted in ECC.
To maintain the CIF distribution go to:
SPRO at APO --> Integration with SAP Components -->Integration via APO Core Interface (CIF) --> Basic Settings for Data Transfer --> Publication --> Maintain Distribution Definition
Kind Regards,
Mariano
Hello,
Planned order will be always transferred if you have previously defined and activated an iModel for planned orders.
The iModel is generated thru CFM1 and it can be manually activated with CFM2.
Kind Regards,
Mariano
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.