cancel
Showing results for 
Search instead for 
Did you mean: 

QM - result recording - defect - Notification requirement

Former Member
0 Kudos

Dear Gurus,

In QM Result Recording, as soon as defect is entered notification is created for the inspection type.

While processing the notification, part is sent to repair shop which can be achieved by action box.

Is it correct? Please confirm.

After receiving from repair shop,  inspection is to be carried out.

If defect exists, defect is to be recorded.

Again it is sent to repair shop.

The same cycle may take place n number of times.

If repair shop does not skilled persons, this scenario is observed.

Client wants to record the every time defect and movements of specific part from notification [Shop Floor ] to repair shop and wise versa.

Ideally the movement must be one time, but some times the movements are 3 to4 times.

It reflects capability level of repair shop.

Requirement

How defect can be entered when part is inspected after repair - multiple times.?

How to capture the movements between shop floor and repair ?

With Best Regards,

Raghu Sharma

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hello,

Yes this can be done. You can achieve it by using action box. whenever notification created with defect then you need to transfer the part to repair store or shop whatever. And when u received it repeat the cycle if defect is there. for this u need to maintain by using the follow up actions and u may also need a technical person for exceptional coding.

Regards