on 07-23-2014 2:26 AM
Hi experts,
I have the SAP ECC 6.0 on MSSQL and HANA DB.
I replicate some data from SAP ECC to HANA DB using SLT.
Now I'm facing a problem.
I failed one load job by preparation error.
In tr-cd:ltr , statistics tab , the target table were appeared as error.
I want to delete this error job.
Because of this error job has been left, I can't re-load the target table.
Please tell me how can I delete this error job ?
Thanks in advance.
Best Regards,
Kazuki
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Kazuki,
Instead of striving to delete the job you may suspend the job which will pause the trigger from the source data for the time being where delta will still be stored in the in the log tables within the source system and later resume it to trigger the replication back again,
but with an error job i think it is better to replicate and setup a data replication all over again and create a row based target table initially which will increase the speed of the initial load .
Regards,
Krishna
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
10 | |
9 | |
9 | |
9 | |
6 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.