Hi All,

do you know any ways to refresh an existing configuration of a material variant configuration data (on basic data 2 and MRP3) after some characteristic values has been changed in the variant table where the values are coming from?

Best regards

Tamas

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member

HI Tamas,

There is a standard report "CUUPDMV" that can be used for update data you mentioned.

BR

Simon

former_member214775
Contributor
0 Kudos

Hi All,

I know all of these solutions but somehow none of them works in our system.

Best regards

Tamas

Flavio
Active Contributor
0 Kudos

Hi Tamas,

we had the same need in the past, and we developed a little custom program (based on a recorded BDC) that calls transaction MM02 and finally saves the materials with the updated configuration.

If you need further info about it, just let me know.

Thank you and bye,

Flavio

Ritz
Active Contributor
0 Kudos

Tamas Rakoczy,

Have you checked with MM02 transaction , I believe in change mode when you will open material variant and try to check values assigned , it will trigger dependencies as well as variant function to pick values changed in variant tables.

I also created a document on same, check it out , it may help.