Former Member
0 Kudos

hi,

i,m trying to change the order of the operations in the super routing, i´ve created a characteristic with the table name PLPOD and field name VORNR, to try to do this, and then I assigned the characteristic to the class, then with the transaction CU01,  I  created  and edit the dependency and finally assigned the dependency to the routing, like this, $self.OPERATION = '0030' if $root.COLOR = '01' ,  The opertaion of the color 01 is 0010, i,m trying to change the order of the operation, but doesn´t work, i don,t know if that will be possible.

thanks!!

Accepted Solutions (1)

Accepted Solutions (1)

Ritz
Active Contributor
0 Kudos

Francisco Fesser,

The reason may be table-field conbination you targetd are not allolwed changing using dependencies.

Its posisble to change master data using dependecnies , but not all fields of routing, BOM sales order etc can be change through it.

For routings only below fileds can be chaged PLPOD (task list and master recipe)

- Activity types
(LAR0106)

- Standard values
(VGW0106)

- Unit of measure
(VGE0106)

- Work center (ARBPL)

-
Operation description (LTXA1, LTXA2)

For more informatuon on allowed table and fileds refer  link. https://service.sap.com/sap/support/notes/935885

Thanks

Ritesh

Former Member
0 Kudos

thank you very much,Ritesh