Hello,
We are implementing Charmlite and want to activate in project landscape.
We are Solution Manager 7.1 SP11 and testing this scenario in sandbox.
Steps completed:
1. in sandbox domain controller, created two virtual systems and made 3 system landscape, where, I can release the transport and see it in QA system (Virtual system buffer)
2. The LMDB has been updated with Virtual system and in SMSY, the entries of virtual system shows up. The logical components have the client information.
Issue:
in /nsolar_project_admin ->System landscape -> change management, When consistency check is performed, we get error message saying
Virtual RFC is miising (I am guessing, it should be okay)
The logical component is incosistent (This might be the reason the CHARM is not getting activated.
"No consolidation system for development system SSA-200 in project ZTEST2
No track for project ZTEST2 with log. system SSA/200"
For me, when i look in satellite system, the consolidation system is a virtual system and it should be fine.
Please advise
Regards,
Durga PK Saitana
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thank you Karthik. Still the problem persists
I went through the blog earlier. I created l ABAP instance manually in SLD and moved into LMDB and can see the entry in SMSY. (I did not see any option of putting virtual flag)
We were trying harmonization of RFC from note 1384598 and since we had virtual systems, went with domain links.
After domain links, the virtual systems are read. the Dev ABAP system is not able to find the consolidated system. In the satellite system, I can release transport and move the transport.
Not sure, why this issue is persistent.