cancel
Showing results for 
Search instead for 
Did you mean: 

ECC dev to new PI sandbox to be point in ABAP proxy configuration

Former Member
0 Kudos

Hi All ,

We are testing ABAP proxy configuration between ECC Dev and PI new system (sand box) .

FYI : Currently ABAP proxy configuration running fine between ECC DEV and PI DEV system .

Now we have to testing ABAP proxy configuration between ECC Dev and PI new system (sand box) .

Pls advise what needs to be done.

thanks

Accepted Solutions (0)

Answers (1)

Answers (1)

Sriram2009
Active Contributor
0 Kudos

Hi John

I thing you have to perform a fresh configuration bewteen Old ECC to New PI Sandbox system. as you followed your old method.refer the SCN ink

Regards

Sriram

Former Member
0 Kudos

Dear All,

Any relation between SLD and Abap proxy configuration ?

FYI:

1,ECC SLD is running fine with PI DEV sysytem (PI7.1).

2,in ECC SAPSLDAPI RFC destination program id is pointing to PI DEV system .

3,In Ecc LCRSAPRFC RFC destination program id is pointing to PI DEV system .

4, PI DEV system is PI7.1

5, PI Sandbox is PI 7.4 SP06 (note : currently we are testing all the interface , PI scenario in new sand box - it is newly upgraded PI system . )

6.In ECC SXMB_adm -> Role of Business System -> Application system

Corresponding Integ. Server -> dest://RFCDESTINATION (H connection type RFC created in ECC SM59.

Below is my question.

1, Latest PI version required H og  G type connection ?

2, SLD (sldapicust,lcrsaprfc,sldapicust,rz70)related information needs to point to PI new upgraded dsystem for ABAP proxy testing in new sand box?

pls advise.