on 07-16-2014 12:51 PM
Hi All ,
We are testing ABAP proxy configuration between ECC Dev and PI new system (sand box) .
FYI : Currently ABAP proxy configuration running fine between ECC DEV and PI DEV system .
Now we have to testing ABAP proxy configuration between ECC Dev and PI new system (sand box) .
Pls advise what needs to be done.
thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear All,
Any relation between SLD and Abap proxy configuration ?
FYI:
1,ECC SLD is running fine with PI DEV sysytem (PI7.1).
2,in ECC SAPSLDAPI RFC destination program id is pointing to PI DEV system .
3,In Ecc LCRSAPRFC RFC destination program id is pointing to PI DEV system .
4, PI DEV system is PI7.1
5, PI Sandbox is PI 7.4 SP06 (note : currently we are testing all the interface , PI scenario in new sand box - it is newly upgraded PI system . )
6.In ECC SXMB_adm -> Role of Business System -> Application system
Corresponding Integ. Server -> dest://RFCDESTINATION (H connection type RFC created in ECC SM59.
Below is my question.
1, Latest PI version required H og G type connection ?
2, SLD (sldapicust,lcrsaprfc,sldapicust,rz70)related information needs to point to PI new upgraded dsystem for ABAP proxy testing in new sand box?
pls advise.
User | Count |
---|---|
93 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.