on 07-14-2014 4:39 PM
Hello Gurus,
Earlier we had 2 ECC systems in the landscape.
Purchase requisition A from APO system supposed use RFC destination 1 and reflect in Plant XXXX
Purchase requisition B from APO system supposed use RFC destination 2 and reflect in Plant YYYY
Now we have only 1 ECC system in the landscape. we have changed the publication settings accordingly. but preq still not getting transferred correctly to ECC system.
Debugging the code shows system trying use wrong RFC destination.
Is there any other configuration setting we are missing.
Please advise.
Thanks In Advance
Shyam
Hi Shyam,
Please find my suggestions in regards to respective configuration settings.
1) Did you delete the obsolete RFC destination(Logical System) from your landscape?
2) Did you correct the RFC destination of plant YYYY to RFC Destination1 (incase you scrap RFC destination2 from landscape)?
3) Check what is the Logical System that is maintained for the location YYYY from the table /SAPAPO/LOCMAP in APO system.
4) Similar check for the products in the table /SAPAPO/MATMAP.
5) Remove the obsolete ECC System from the BSG using T-code /SAPAPO/C2.
Post checking and correcting, do an intial transfer of locations via CIF from the current ECC system.
Thanks,
Santosh KB.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.