Hi All,
I have a requirement of transferring data from ECC to APO. I am using EXIT_SAPLCMAT_001 fro this purpose. The problem is, I need to transfer the data of a field that is not present in cif_matloc but present in /sapapo/matloc.
How should I proceed...Please help....this is an urgent requirement
Thanks & Regards,
SriLalitha
hi,
tell us what data you want to transfer from ECC to APO - Please provide the field name.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I need to transfer RELDT (Replenishment Lead Time) field from ECC to APO. RELDT is present in APO side (/sapapo/matloc) but it is not present in cif_matloc (ECC side).
I've added the field (RELDT) in CI_MTLCCUS. I'm able to use this field using OT_CIF_MATLOCCUS but not using CT_CIF_MATLOC.
So, now after passing the required value to OT_CIF_MATLOCCUS-RELDT and MODIFY statement (i.e. MODIFY OT_CIF_MATLOCCUS) the value of RELDT is not getting passed from ECC to APO
Pls help..
Thanks & Regards,
SriLalitha
Hi,
you may want to go to the transaction /SAPAPO/SNP_SFT_PROF
In this field, you specify how the extended safety stock planning determines
the forecast of the replenishment
lead time (RLT). The following values are available:
longest
Supply
Chain
You can retrieve the replenishment lead time forecast yourself by using the
GET_LEADTIME
method of the Business Add-In (BAdI) /SAPAPO/SNP_ADV_SFT.
Number of calendar days needed to obtain the product, including its
components, through in-house
production or external
procurement.
The replenishment lead time (RLT) is used in the enhanced methods of safety
stock planning in Supply Network Planning (SNP). The goal of safety
stock planning is to comply with the specified service level, in order
to be prepared for unforeseen demand that may arise during the replenishment
lead time. The longer the RLT, the higher the planned safety stock level.
The field is taken into account by the system only if you have specified
master data or master data/supply chain in the RLT: Determine
Forecast field of the safety stock planning profile used.
Hope this helps.
The RLT from ECC is in MARC-WZEIT which is transferred to APO in structure /SAPAPO/MATIO field CHKHOR.
May be if you maintain the setting in the profile, you may get the value in RELDT.
Thanks.