Issue in transfer of data from ECC to APO

Former Member
0 Kudos

Hi All,

I have a requirement of transferring data from ECC to APO. I am using EXIT_SAPLCMAT_001 fro this purpose. The problem is, I need to transfer the data of a field that is not present in cif_matloc but present in /sapapo/matloc.

How should I proceed...Please help....this is an urgent requirement

Thanks & Regards,

SriLalitha

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

hi,

tell us what data you want to transfer from ECC to APO - Please provide the field name.

Former Member
0 Kudos

Hi,

I need to transfer RELDT (Replenishment Lead Time) field from ECC to APO. RELDT is present in APO side (/sapapo/matloc) but it is not present in cif_matloc (ECC side).

I've added the field (RELDT) in CI_MTLCCUS. I'm able to use this field using OT_CIF_MATLOCCUS but not using CT_CIF_MATLOC.

 

So, now after passing the required value to OT_CIF_MATLOCCUS-RELDT and MODIFY statement (i.e. MODIFY OT_CIF_MATLOCCUS) the value of RELDT is not getting passed from ECC to APO

Pls help..

Thanks & Regards,

SriLalitha

Former Member
0 Kudos

Hi,

you may want to go to the transaction /SAPAPO/SNP_SFT_PROF

Determine Forecast of Replenishment Lead Time

Use

In this field, you specify how the extended safety stock planning determines
the forecast of the replenishment
lead time
(RLT). The following values are available:

  • Supply Chain

      The system determines the RLT forecast using the supply chain structure by

      adding the corresponding production, transportation, goods receipt, and goods

      issue times. If there are alternative procurement options, the system always

      takes the

longest

    option into account.

  • Master Data

      The system determines the RLT forecast from the location product master

    data.

  • Master Data/ Supply Chain

      First, the system determines the RLT forecast from the location product

      master data. If no RLT forecast can be determined, the system determines the

      forecast using the supply chain structure (as described under

Supply
Chain

    ).

Dependencies

You can retrieve the replenishment lead time forecast yourself by using the
GET_LEADTIME
method of the Business Add-In (BAdI) /SAPAPO/SNP_ADV_SFT.

Replenishment Lead Time in Calendar Days

Number of calendar days needed to obtain the product, including its
components, through in-house
production
or external
procurement
.

Use

The replenishment lead time (RLT) is used in the enhanced methods of safety
stock planning in Supply Network Planning (SNP). The goal of safety
stock planning is to comply with the specified service level, in order
to be prepared for unforeseen demand that may arise during the replenishment
lead time. The longer the RLT, the higher the planned safety stock level.

Dependencies

The field is taken into account by the system only if you have specified
master data or master data/supply chain in the RLT: Determine
Forecast
field of the safety stock planning profile used.

Hope this helps.

The RLT from ECC is in MARC-WZEIT which is transferred to APO in structure /SAPAPO/MATIO field CHKHOR.

May be if you maintain the setting in the profile, you may get the value in RELDT.

Thanks.

Former Member
0 Kudos

Hi,

Is there any code that needs to be added to the ECC and APO side?

Thanks and Regards,

SriLalitha