SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

Dynamic Period Control configuration error

Former Member
0 Kudos

Hi Experts,

I am trying to configure DPC but is not giving me correct results.

My scenario is:

1: when movein done, first bill will be normal billing (estimated or actual read)

2: when estimated and actual read: both period considered.

3: when actual and estimated read: only estimated read considered.

4: when actual and actual read:  only current read considered.

Please check the attached configuration (DPC.docx).

How to use basic period category of the periods to set up?

Could you please suggest me?

Regards,

Priya

3 REPLIES 3

Former Member
0 Kudos

Hi Priya,

There is no attachment reference doc. Also elaborate the incorrect result you are getting.

Thanks,

Rakesh

0 Kudos

Kindly find the above config detail which is giving wrong result.

Billing is not done correctly.

0 Kudos

Hi,

Have you defined Dyn. Backbilling Groups?

What is the scenario you are executing for billing please?

Best Regards