cancel
Showing results for 
Search instead for 
Did you mean: 

Problems with Automated Monitoring SAP GRC PC 10.0

Former Member
0 Kudos

We are using the Automated Monitoring in GRC Process Control 10.0 to configure a job for SAP standard control and have a problem with the job scheduler. We perform the search for control selection in the step 3(Select Control) and this display the warning message “There is no data matching the selection criteria, please refer to help”.

The scenario created is follows:

Business rule (Configurable Type) was created with valid date of 01.01.2013 to 31.12.999

In the Activities and Processes section, process and subprocess was created. Later the corresponding control was created. This control has a regulation, risk and control objective assigned.

Thanks.

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi

Simple check is to also make sure the Control testing attribute is set to Automated/Semi-Automated in the Business Processes under Master Data.

If your dates line up and everything is consistent then maybe it is the Automated testing setting.

Let us know if you solve this.

Thanks

Former Member
0 Kudos

Hi Lizeth,

Can you specify the period and frequency you are using to schedule the job?

Regards,

Ramakrishna Chaitanya

Former Member
0 Kudos

The frecuency is monthly and the period 2014.

Thanks.

naveen_alluru
Active Participant
0 Kudos

Hi

Please check if roles are given for control...

and org. is in scope for SOX regulation...

Former Member
0 Kudos

Thank for your replay Navee.

Yes I have all the roles in scope for SOX Regutation.

Former Member
0 Kudos

I tried this on 10.1 and was able to pull up a control. try creating a new control, assign it to the sub process and organization with dates expiring 12.31.9999, make sure the control is only assigned to one specific business rule.

former_member205878
Contributor
0 Kudos

Hi Lizeth,

There could be different reasons related to this error.

Please have a look at the SAP Note 1655474 .

May be it helps in solving the error.

Regards,
Silky Sharma

Former Member
0 Kudos

the control effective date needs to be 12.31.9999 check the dates on your controls associated with that specific rule.