on 06-10-2014 6:14 AM
Hi All,
I want to inspect a material by Handling Unit, I have set "Inspection for HU" within the Inspection Setup of the material master. I created PO and inbound delivery, in the inbound delivery I did packing, but inspection lot is not created after packing. When I go on with MIGO, system throws error message "Change the inspection stock of material in QM only", according to this message, there should be an inspection lot already created, but I cannot find it in QA32.
Regards
Danny
Hi, it is not possible in standard SAP. you should use user exit to trigger inspection for HUM.
(1) Create new inspection type with HUM Active
(2) Coding in user exit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
There are two prerequisition:
1) Check configuration setting : SPRO --> Logistics - General --> Handling Unit Management --> Basics --> Technical Basics--> Materials Management--> Inventory Management --> Set QM Check and Delivery Type for Each Movement Type. the respective movement type is not deactivated for quality inspections. The indicator QM not active is not set.
2) In material master, Handling unit should be active for inspection type.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.