on 06-06-2014 1:16 PM
Hi All,
We are implemeting a NWBPM process for the first time and we followed the below link:
We added the PO server through management console too.
But during deploying the process,we got errors.
[Error ]: [#0]: Deployment Exception during deployment phase [DeploymentException], cause=[ASJ.dpl_dc.001085 Operation [deploy] of [demo.sap.com_dc_XXXX] failed]
SAP PO version is 7.31 EPH 1 SP 8, while that of NWDS is 7.31 EPH 1 SP 10
Can you please let me know:
-Is it version incompatibility?
-Is it relevant to admin rights or something? Also the admin rights, if any?
Also possibly the steps to integrate SAP PO with NWDS
Thanks in advance
Regards,
Atreyee
Hello,
You should have pasted complete error description.
Anyway, i think the error message is because the NWDS version which you are using is not the same as that of ur Server. Install NWDS 7.31 SP 10 and then build and deploy BPM.
Thanks
Amit Srivastava
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Amit,
I have installed the NWDS 7.31 SP 10 only and it is not working. The versions of SAP PO and NWDS are same. Just the SP is different. I have gone through few links, it was mentioned the SP of NWDS can be equal to or higher than the SP of PO. Can the difference in the SP cause such error? Or is there some steps I am missing while integrating with PO?
Also find the screenshot of the error log.
Regards,
Atreyee
Hi Amit,
All the details were provided. we are able to successfully deploy now. We just needed to work with equal or lower version of NWDS. In the version, we need to take care that the SP and PAT of the NWDS is not higher than than of SAP PO.
Ex- If the version of your PO is 7.31 SP 08 PAT 0000
You cannot deploy SAP PO server with 7.31 SP 09 PAT 0000 nor 7.31 SP 08 PAT 0013.
You have to consider 7.31 SP 08 PAT 0000 or less than that.
Thanks and Regards,
Atreyee Chandra
Hi All,
Thanks for your help. The error is resolved. It was due to Higher version of NWDS (version including SP and PAT needs to be considered).
On checking the stack throughly I came up with the error:
"The given process model was built with a NWDS or development track of a higher version than the target runtime. Revision number of built process model: 4.4. Revision number of process runtime: 4.3. Please refer to SAP note 1600131 for details......"
One thing learnt:- First thing you need to check is the exact version of SAP PO including the Service Pack and Patch Level.
You can check this from:
1. Directly through the URL:: http://<host>:<port>/sap/monitoring/SystemInfo
2. From http://<server>:<port>/ -> System Information -> Component Information
The NWDS should be either less than or equal to the version of SAP PO. You need to check all the details including Service Pack and Patch level.
*** In our case, although the SAP PO and NWDS are of same version i.e 7.31. But the higher SP and PAT of the NWDS was giving the error.
Regards,
Atreyee
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
>> -Is it version incompatibility? No.
Its recommended to use higher sp of the nwds.
br, avinash
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
81 | |
10 | |
10 | |
9 | |
6 | |
6 | |
5 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.