on 06-05-2014 4:21 PM
Hello Everyone,
I am in a bit of a pickle. I had 2 KAs for a material/serial number combination say 1 and 2. The material has been confirmed in the schedule line
in KA 1 but then BP wanted to bring it in using KA 2 so he assigned a reason for rejection for that line item in KA 1 so he could confirm the schedule line
in KA 2. This didnt work.
Unfortunately I deleted the confirmed schedule line in KA 1 and then deleted the line time itself in KA 1. This didnt result in the material being available for a return with KA 2.
As a result of the above in MMBE the material is still with the customer (KB)(we are using KB and KA for rental process mapping)
but if look at KA 2 availablity check result for the material that qty is still confirmed against KA 1 line item which we deleted.
Please assist in bring the material to available
Regards
Madan Shetty
I had 2 KAs for a material/serial number
What do you mean by KA?? As far as possible, please dont use any abbreviated words and conclude everybody would read your mind. I presume it is order type.
When you say rental processing, I don't understand why you were involving delivery. Ideally, the process should have been Order related billing. Also are the two lines have same material code?
Please share maximum informations both from business perspective and SAP point of view so that suitable suggestions can be given.
G. Lakshmipathi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Lakshmipathi................ I am sorry I assumed with KA being a standard document type I wouldnt need to have to explain it.
We use rental process to map item being given to agent as a sample which has to be returned with in a stipulated time period.... We use the KB document type to map items given to agents and KA doc type to bring the same back to the plant. If I am sending it out and bringing it back using movement types wouldn't you need to create a delivery document????? which in this case is 631 and 634.
I hope this explains the business process.
Issue is 2 return doucments were created and the item /serial number combination was confirmed in one of them. Now that line item has been deleted but the material/serial number combination is still not available for a return.
MMBE shows that the combination is still with the agent 631 mov type I need to do a 634 but i am not able to do the same.
Issue is 2 return doucments were created and the item /serial number combination was confirmed in one of them. Now that line item has been deleted but the material/serial number combination is still not available for a return.
Why in a return order, you were doing availability check? Also how the return order has been created? With reference to what document? Fill Up Order or Proforma? Ideally, KA should have been generated by referencing the preceding document F8 in which case, you would not have faced this issue.
G. Lakshmipathi
Thanks for your time,
IN our case we do not bill the agents nor is it possible for them to decide to buy the sample equipment these are only for demo purposes at the client site(which forms a large portion of their business).
We create a KB document and then delivery document so now the material is with the agent and when he is returning it we create a KA document with reference to the KB doc and then through return delivery we bring it back in to the plant. Availability check is to verify if the agent has the material with him to bring back in to the plant.
This process has been running smoothly until now when I deleted the line item, the material serial number combination is stuck i cant seem to bring it back in to the plant. Seems like something went wrong with the updations on deletion.
We use rental process to map item being given to agent as a sample which has to be returned with in a stipulated time period.... We use the KB document type to map items given to agents and KA doc type to bring the same back to the plant. If I am sending it out and bringing it back using movement types wouldn't you need to create a delivery document????? which in this case is 631 and 634.
Dear
If you want to map your goods sent on KB and
will be picked back by business within permitted days with KA.
But in KA --the movement type will be 632(not 634)
Please update...
Phanikumar
Have you executed an availability check for KA2 after you deleted the KA1? The availability situation will not be updated automatically. You need to trigger a new availability check.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Noel with Co09 for KA1 it says Sales order/item not found
and with Co09 for KA2 quantity is all zero.
When I look at the avaiability overview in the Sales order(KA 2) yesterday it showed me the earlier order
and confirmed qty as 1 but today it doesnt show me the same.
But I still cant confirm the schedule line with the 2nd order .
Regards
Madan Shetty
If you have all 0's for KA2, then there is nothing available.
It may have happened that there was stock available for KA1 so this was confirmed. Then this available stock becomes unavailable (e.g. maybe a material document was reversed). Then you have a situation where KA1 is overconfirmed. Usually such a scenario is corrected by running a new availability check. In your case, KA1 is deleted. You think this should free up stock for KA2. However, this is not the case - there is no stock available as the material document was reversed.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.