on 06-02-2014 8:35 PM
Hi all,
In my current client, there is a scenario that once Inspection lot is created, users do normal Inspection with 7 samples and if its rejected then they go for tightened Inspection.
I tried to map it through sampling scheme with AQL value and in one document I read that after giving value for 1st sample and clicking on valuation , system will create 2nd sample and it will go like this till 7th sample.
But when I am trying to do result recording, system is not creating next sample, i.e. system is behaving as normal inspection lot do.
Can Anybody helps me to achieve this
Hi,
Check this link...
Thanks
Kumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Are you using "physical sampling" in the header of the inspection plan?
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I guess following could be reason and therefore, please run a check on them,
ntn
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Vivek Varun,
You have to enter the result of 10 samples and if the defect is more than the you have specified in the sampling scheme, you get the option to create 2nd sample. For this you have to valuate and click on the valuate icon. Then this will give the option to create a new sample.
You can also do the automatic valuation fron changing in configuration.
Regards,
Saurabh Kumar
Dear Vivek,
Dynamic Mdification rule is not required.
What i have studied from your post is that if you see status of the lot is in valuation means status is 3 and you have not performed all sample result recording and Defect class is assigned to your characteristics but it should not be like this.
Unless until you do not do the all sample result recording your status should not change into 3 and Defect class should not be assigned
Can you use Attributive Inspection Non Confirming Unit and not select manual. Check by changing you valuation mode.
Regards,
Saurabh Kumar
Dear Vivek Varun,
You have to do Sampling Procedure with Dependent Multiple Samples Method.
In this case system will not create the inspection sample automatically but you will get the option to create and you have to click on it.
Regards,
Saurabh kumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You have to manually click the create button to create samples in results recording screen. The pre requisite is to maintain sampling schema w/ c1 d1 values to define the acceptance. You cannot create samples once it's accepted and closed. System will let you allow to create only if is rejected.
Mahee
User | Count |
---|---|
98 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.