former_member205751
Participant
0 Kudos

hi

Time buckets

Time series

Order series

Storage bucket

Time bucket profile

Key figure

Demand planning data

In what way it is related to each other ,comprehending  The relationship between the above said is confusing to me but Understanding the  interrelationship between all the above is vital to move ahead.here goes my scenario,

Scenario:

The customer has given an order of 800 pieces for december month ,300 for january,700 for february (customer demand ) ,I have with me 11 machines and stock of 50 pieces ( product is same but one is chromium treated ,product B,aluminium alloy and product 3 something else i dont know but structurally all 3 products are same

Material does not have sub assemblies and only one BOM item which is a NUT ,and 3 operations

Machine 1,2,3,4 : works 5 hours/shift  with breaks in between for

Machine 5,6,7,8, works 8 hours ( 1 shift) continuously

Machine 9,10,11 works 6 hours and 2 hour break

minimum stock of 50 has to be kept at any given point of time it is mandatory.

I know is RES01  I need to fix time buckets and machine details I am using single mixed resources

In TR 30 storage bucket profile -I declare 1 year as a staying period in planning area.

In RSA1 I create key figure for stock

Now my objective is to run SNP heuristic to create a planning sheet,-my users want that in SNP94 you have location,multilevel planning,network labels -I have skiped  the remaining two and am going to use location heuristic alone.

How do I MAP this scenario in APO ,but take note I am not using ECC at all and no CIF ing  transfer of master datas  occur.imaigine there is no ECC at all

Please help me in getting an understanding in Mapping practically on the system .those theory in help.sap.com is not helping me it appears to me like building castle in the air ,  it is only adding to the confusion-.with all the above said data I need to make a production planning run.

From your practical experience  please  help me out via screens, because I feel  help.sap.com is for bookish  people designed for managers and not for SAP hands on labor like me

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member205751
Participant
0 Kudos

kiran and other planning specialist  can you please provide a roof top view of how would i proceed with the above scenario...it should be lengthy and boring..but still if you can give a road map for the above said scenario in few words..i will  pick up from that point by making references here and there

former_member205751
Participant
0 Kudos

kiran and other planning specialist  can you please provide a roof top view of how would i proceed with the above scenario...it should be lengthy and boring..but still if you can give a road map for the above said scenario in few words..i will  pick up from that point by making references here and there