cancel
Showing results for 
Search instead for 
Did you mean: 

DIP Profile configuration for contract

Former Member
0 Kudos

Dear Experts,

I am working an implementation project , has a business requirement, company A doing business with various customers

the customers are owning land

company A owns drilling equipments

company A has an agreement with customer drilling the land to recover the oil

company A deploy equipment, manpower and required consumables , like cement....

when the work starts, phase by phase billing happens

-------------------------------------------------------------------------------------

here i have problem of mapping this scenario

I thought of mapping this through resource related billing

creation of contract - debit memo request(DP91 ) - billing

problem here is

what are the materials here, equipment is a material?  and manpower is material? for cementing purpose i am using cement and gravel (BOM)

1. how do i accommodate the following cases

BOM (Cement , binding chemicals , gravels and water)

Equipment (Rig)

Manpower (Engineers)

2. How do i bill them since those are service items?

Please give a break through for my project

Regards,

Pratheep

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member203098
Active Contributor
0 Kudos

Hi Pratheep,

In MM-FI integration maintain different consumption G/L, cost elements for materials cement, gravel etc..

In DIP profile material determination assign materials like cement, gravels etc and in criteria define above said consumption cost element as set for each and every material. with these settings system will read the actual cost posted against the consumption cost element while DP91 execution and individual line items will be appeared in billing request for particular period.

For Manpower (Labor hours), create a service material and assign in DIP profile material determination.

Regards,

Former Member
0 Kudos

     Thanks NAG for your input

the cement and gravels are treated as materials with valuation class 7920?

if the labor hours , created as service material ,

then the contract lines will be

10 cement 100 kg

20 Gravel    400 kg

30 binding agent 50 kg

40 water       10000 litres

labor hours ()Senior engineer) 1

Rig  1

each line contains seperate DIP  profile is required?

Please help me to build the scenario

Regards

Pratheep

former_member203098
Active Contributor
0 Kudos

Hi Pratheep,

Use different valuation class for cement and gravel because you're looking for split of actual cost as line items in billing request. correct me if i am wrong. create senior engineer as service material. No need to configure multiple DIP profiles one is sufficient, assign already created materials in material determination of DIP profile.

Regards,

Former Member
0 Kudos

Hi nag,

I have tried this scenario,

But system considering only one item in the DMR  and cost is flowing with the amount i have confirmed.

But while creating billing VF01, it is copying the cost but i require revenue in billing

please suggest how to tackle this scenario?

Regards,

Pratheep