on 05-15-2014 2:45 PM
Hi,
We have performed the SP10 upgrade on our Solution Manager system and when we try to import a Transport request into the Test system (Managed system) through Urgent Change it fails with an error "System Cancel RFC destination SM_<SID>CLNT702_TRUSTED, Call TMW_SET_PROJECT_SWITCHES: No RFC authorization for function module TMW_SET_PROJECT_SWITCHES.
Is it something an issue with the authorizations of the User performing the step or RFC issue.
Please help with a possible solution.
Syed
Hi Syed
Make sure that Trusted RFC is working with by performing Authorization Test
Please check with the CTS status switch in Tx: /TMWFLOW/PROJ
Kind Regards
Phaneendra K
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Syed,
Please check whether your user has S_RFCACL authorization according to note 128447?
Kind regards,
Roland
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Syed,
If the RFC connection from Solution Manager to ERP system connects with the current user, then the user who is performing this step in solution manager is missing the authorization in ERP system.
If the RFC connection is with an RFC user, then check the permissions of the RFC user in ERP system.
You can check which user is accessing the RFC connection in SM59.
S_RFC and S_RFCACL are the auth objects which are missing in ERP system. Provide the access and then check.
Regards,
Laxman
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
87 | |
10 | |
10 | |
10 | |
7 | |
6 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.