on 05-02-2014 4:56 PM
Hi Gurus,
I need to create SNP PPMs from ECC routings.
The routing has a single operation in a single work center (with setup and production formulas in scheduling and capacity tabs). For some of the products, when the PP/DS PPM is created in APO by CIF the production activity is missing, so I cannot use it to create the SNP PPM (for other products it is ok). I checked the PP/DS PDS and it is created ok (both setup and production activities).
Is there a known reason for this? I looked for oss notes without any luck. Any help is more than welcomed.
regards,
J.
Hi James,
PPM is always created in relation to the key date from the plan and the bill of material. The integration model contains this key date (selection date). If you change the plan or the bill of material, a new integration model must be created containing a selection date greater than or equal to the change date.
First, in the corresponding master data transaction of the corresponding task list type (CA03), ensure that the plan exists on the key date of the transfer and that is has the opeartions that you expect.
Also refer OSS consulting note 448085 - PPM transfer: Tips and tricks.
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi James,
Please check Note - 390149 and 214597.
regards
Kishor
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
10 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.