Dear All,
I have a situation where the production variance being calculated at the time of order settlement of a finished good material is not flowing to the profitability Report at one location however, when the same is being calculated at another location the same is correctly flowing.
Kindly guide me with the probable reasons for the same and the manner in which the same can be resloved.
Regards
Manish
Hi Manish,
Please check your PA transfer structure of the settlement profiles of both the production orders and also check settlement profile config "Variances to Costing-based PA" checkbox should be tick. Also in valid receivers please check you have included Prof. segment.
Br
Sagar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Check the settlement profile of Production orders of both the locations
"Variances to costing based COPA" must be ticked to flow variances to COPA
Br. Ajay M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.