on 04-28-2014 10:40 AM
Dear Gurus,
my requirement after 10 quantity we will do the inspection .
i have made the entry in Routing:
Insp. Points 150 Generated insp. point, quantity or time on hearder
Quantity Interval 10 EA on operation details screen.
now my question 1.when i am making production order of 5 ea why system is making inspection lot?
2. when i am making production order of 40 ea system is not making four inspection lot?
Please do the needful.
siva
Hi,
I'm not able to follow your query properly. It seems that you need inspection lot for every 10th GR.
If that is the case, I think you need to look around DMR. You can skip all the unwanted inspection lots as per your process.
I don't think if inspection points can be useful here.
ntn
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Siva,
When you are working with inspection points based on qty defined system does not create 5 inspection lots, instead it creates 5 inspection points for entering the results.
For Eg: You have maintained Qty interval as 10. If your order qty is 50, then system will generate 5 inspection points for entering the results. Check in QE51N.
Thansk & Regards,
Ramagiri
yes system will generate five inspection point .
but when i am checking in QE51N ,go to inspection lot number tab ,
put inspec lot number and select default next inspection point tab and execute
after execution left hand side system shows the inspection lot
system ask for partial quantity number we put 10 and enter now we will be on RR tab here we will fill all the details and save again system will next inspection point ok
if i made production order for 40 and inspection quantity is 10 system should make 4 inspection point
but it is making continuously more than 4 inspection lot.
Please do the needful.
Siva
Hi Siva,
You need to click on Inspection date/partial lot no as generated by system based on lot size and ref qty maintained in routing. Do not click on Next Inspection. This will generate manually extra partial lot and inspection point if you still want to record results beyond system generated inspection points. Follow the below process.
Thanks & Regards,
Ramagiri
Hi Siva,
Better don't select the check box "Default Next Inspection Point" on QE51N screen. If you Select that check box and execute then along with Inspection Points determined based on Qty Ref and Lot size one more Next Inspection point will be displayed. If you don't select, then only the system generated inspection points will be displayed. Hope it is clear.
Refer the below document for mapping the process.
Thanks & Regards,
Ramagiri