Hello guys,

In our effort to implement PPDS solution we have an issue at planned order level. We are in repetitive manufacturing and the planned orders are created and scheduled by PPDS from SNP (after conversion). On APO side everything works very well. We have an optimized sequence to the seconds with a finite capacity. The issue is on ECC side after CIF transfer. The dates are transferred correctly but we don't have any start/end time (min, hours or seconds). The fields are blanks.

On APO side I have a production schedule to the second, so the PDS works very well and it was transferred from ECC.

Any idea will be appreciated.

Thanks, Marius  

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

To share with you guys, note 161028 has fixed the issue!

Marius