TECO Status in WBS ELement not allowing DP91 transaction for RRB

0 Kudos

Hi Team,

  I would like to look if DP 91 will not allow to Bill a  particular cost once the project is in TECO Status.

Please confirm if this is configurable.

Regards

Vignesh R

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Vignesh,

Go to T-code BS23 --> Open the status TECO Technically completed --> Check and confirm whether billing is allowed or not.

Thanks

BR,

M T

Answers (1)

Answers (1)

0 Kudos

Thanks for your clarification.

I have one more query which is not related to the Project status.

When a Dynamic item is being populated in DMR after DP91 transaction,the summarisation of material or activity takes place and If there are A(50$),B(25$),C(25$) are the materials posted and grouped to form Dynamic Item "Material" and E(100),F(50$),G(50$) are the activity posted and grouped to form Dynamic item "Labor" based on grouping set in material determination,

the DMR will reflect as

Line               item 10

Material         Material

Price             100$

Line                item 20

Material          Labor

Price              200$


My client need a report which would give a detailed list of Dynamic item along with quantity and value by just entering the Billing document number.


Like


Material


A   50$

B   25$

C   25$


Labor


A  100$

B  50$

C  50$


What are the tables I need to refer to bring up a report as stated above.

I couldnt get these details in AD01DLI and AD01DLIEF


Regards

Vignesh R

0 Kudos

I have got the solution for the above request so please ignore my query.

Regards

Vignesh R