on 04-21-2014 5:31 PM
Hi Team,
I would like to look if DP 91 will not allow to Bill a particular cost once the project is in TECO Status.
Please confirm if this is configurable.
Regards
Vignesh R
Hi Vignesh,
Go to T-code BS23 --> Open the status TECO Technically completed --> Check and confirm whether billing is allowed or not.
Thanks
BR,
M T
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for your clarification.
I have one more query which is not related to the Project status.
When a Dynamic item is being populated in DMR after DP91 transaction,the summarisation of material or activity takes place and If there are A(50$),B(25$),C(25$) are the materials posted and grouped to form Dynamic Item "Material" and E(100),F(50$),G(50$) are the activity posted and grouped to form Dynamic item "Labor" based on grouping set in material determination,
the DMR will reflect as
Line item 10
Material Material
Price 100$
Line item 20
Material Labor
Price 200$
My client need a report which would give a detailed list of Dynamic item along with quantity and value by just entering the Billing document number.
Like
Material
A 50$
B 25$
C 25$
Labor
A 100$
B 50$
C 50$
What are the tables I need to refer to bring up a report as stated above.
I couldnt get these details in AD01DLI and AD01DLIEF
Regards
Vignesh R
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.