cancel
Showing results for 
Search instead for 
Did you mean: 

GRC 10 + CUA + GRC 5.3 on one server?

Former Member
0 Kudos

Hi Experts,

currently we have a Netweaver system running GRC10 and we have also CUA activated.

We want to migrate one older GRC 5.3 system on the same server.

In the note 1590030 it is being said that as of SP04 you can theoretically have a GRC5.3 and a GRC10 running in parallel. But only on the backend systems side. What if you have GRC 5.3 and GRC10 running on the same server  where CUA is configured ? Is this possible?

does anyone ever tried this?

thanks in advance

david

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member184114
Active Contributor
0 Kudos

David,

What is the business use of using both systems parallel?

Regards

Former Member
0 Kudos

Hi Faisal

eventually we will migrate the GRC 5.3 to GRC10, but for the moment we need both systems to run in parallel on one server. In the moment they run on different servers.

Thanks,david

former_member184114
Active Contributor
0 Kudos

In than case, why dont you migrate it if eventually are will be only GRC 10.?

Former Member
0 Kudos

as i mentioned we will migrate, but for the moment we need both systems running in parallel. The question is, can they run smoothly on the same server?

former_member184114
Active Contributor
0 Kudos

I have not done this. However, guess no problems as long as system is technically strong enough.

All the best!

Regards,

Faisal