Hi Guys,

In SAP standard the system defaults with the setting 2. Valuation. I would like to change this setting so it defaults with 3. Automatic Valuation ....., by doing so I avoid changing this setting each time I create an inspection plan. Does anybody know where I can change this setting and if its possible to do so.

Note: I want to get rid of this overall valuation screen which pops up once my inspection is done.

BR, Henrik

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member42743
Active Contributor
0 Kudos

No. You can't change those basic defaults to the best of my knowledge.

But you can create a basic, generic plan, (with a blocked status), that you use as a copy model when you create new plans.  I've had places were we create 4 or 5 of these basic plans that are set up just to be used as copy models.

Then you just copy it, change the status to released, and make any individual changes you need to for it.