cancel
Showing results for 
Search instead for 
Did you mean: 

Quality Inspection Lot Idoc

Former Member
0 Kudos

Dear All

I have been trying to configure the Idoc generation after inspection lot is created. I have gone through all the threads but still not clear.

I have to use QCERT message type. Please let me know what is the triggering point for the Idoc to sent the inspection lot number and configuration, I have also configured for the certificate generation and logical systems.

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member221025
Active Contributor
0 Kudos

Hello Adithya,

Do you want to transfer inspection results of incoming certificate to 01 inspection lot for the same GR?

What are the settings maintained in Material Master (Control key and cert), Origin of results data in Inspection plan, Certificate control in QI02, activated workflow template in Idoc config?

Amol.

Former Member
0 Kudos

Hi

Can you please help me on this.