Dear All
I have been trying to configure the Idoc generation after inspection lot is created. I have gone through all the threads but still not clear.
I have to use QCERT message type. Please let me know what is the triggering point for the Idoc to sent the inspection lot number and configuration, I have also configured for the certificate generation and logical systems.
Hello Adithya,
Do you want to transfer inspection results of incoming certificate to 01 inspection lot for the same GR?
What are the settings maintained in Material Master (Control key and cert), Origin of results data in Inspection plan, Certificate control in QI02, activated workflow template in Idoc config?
Amol.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Can you please help me on this.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
94 | |
9 | |
9 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.