on 03-24-2014 12:42 PM
Hi,
In HCM we have scheduled the job for the program RPLDAP_EXTRACT_IDM to run every hour. This jobs picks the delta of the HR changes and exports to IDM as per the job. But we have found that some of the HR data like address data of the existing Identities in IDM are not getting synced. The job log in HCM gives the message "The System exported the data successfully"
We have set the log to be sent to a recepient, but still there is no file generated.
Please can someone guide me as to how to find out which PerNr's data and what changes have been exported to IDM.
Also thought this job has exported data, it is not getting synced in IDM. How to check where the issue lies?
Regards
Kavitha
Hello Kavitha,
on the HCM side it is possible to run a trace on the LDAP connection to see
what is passed to the VDS server. On the VDS server itself you can increase the log level of
the Operation trace and then inspect this after the sync. See note
1742598 - Tracing HCM Abap Server to Virtual Directoty Server data transfer
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Christopher,
Thanks for the information.
The report SPLDAP_DISPLAY_LOG_TABLES gives information only of the records that are not exported. The job runs successfully so looking at this report is not helpful.
What I want to know from the HCM side when the job runs is which all pernr information is passed to Staging area and what changes have been captured. Is there a way we can get this information in HCM.
Regards
Kavitha
User | Count |
---|---|
90 | |
10 | |
10 | |
10 | |
7 | |
7 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.