Hi all,

Is there a way to get the cost of parts delievered against a sales doc?

Any help would be great.

Thanks

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

I got the parts from the sales doc using VA03, I then got the BOM for that material using ZMM1. I then used ME1P to get the last PO and the cost of the last PO. I then checked when this PO was GR using ME22N.

It was a long process but it worked.

former_member186385
Active Contributor
0 Kudos

Hi Peter ,

are you asking about cost (VPRS) for spares ?

Former Member
0 Kudos

Hi Vemuri,

I need to get the cost of parts that we have recieved from the supplier based on a sales document number which we get from our sales department.

I think the logic maybe something like:

-BOM from the sales document

-Check the parts which have been received

-Check the cost of each part that has been received

I just dont know which tcodes to use to check this information.

Thanks

Lakshmipathi
Active Contributor
0 Kudos
we have recieved from the supplier

I believe, you should be having a Purchase Order for this and for inwarding the material, MIGO would have been executed.  So you can check in MB51 with one of the input parameters as movement type 101 with posting date.

G. Lakshmipathi