cancel
Showing results for 
Search instead for 
Did you mean: 

Result recording in Quality management

Former Member
0 Kudos

Hi,

I have created one material with Base unit EA. I have create inspection plan against the material.

Material stock available on site for the batch with 20 qnt.

while going to make result recording the inspect qnt will showing with same qnt (20) on batch.

But when my base unit in article is Meter(M) and doing same process, it will show by default 1 in inspect in result recording.

Base unit in EA

,

IF Base unit in Meter (M)

Please suggest for the same.

Regards

Hiren Makwana

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

we do not use sample procedure.

Regards

Hiren

Former Member
0 Kudos

Dear Hiren,

If you want to fulfill your requirement then you should use sampling procedure.

Sandip

former_member221025
Active Contributor
0 Kudos

Hello Hiren,

Kindly refer below thread recently closed by Lakeer, solution has been provided by Lakeer himself at the end of the thread.

Amol.

Former Member
0 Kudos

Hi,

add the sampling procedure in your QA plan.

Former Member
0 Kudos

Check in material master whether 'm' is maintained as alternate unit of measurement.

if 2ea=1m in material master and inspection plan is having 'm' as unit then in that case this behavior is observed.

please check

Former Member
0 Kudos

Hi,


But i want to do my result recording with available stock on batch with base unit M.

In this case in result recording, in inspect it will showing by default 1 but stock available on batch with 100 M.

So 100 M will come in the inspect.

What will i do so that it will fetch the 100 M in inspect and result recording will done for that inspect qnt?

Regards,

Hiren Makwana

Former Member
0 Kudos

Dear Hiren,

It is depend on your sampling procedure which you used in inspection plan.

If you want to sample inspect quantity will be same as inspection lot quantity then you need to change Sampling type = 100 % inspection in QDV2.

Please create new lot after changes and check it is work or not.

Regards,

Sandip

Former Member
0 Kudos

Hi,

We do not use any sampling procedure in inspection plan.

Regards,

Hiren Makwana

Former Member
0 Kudos

Can you provide the screen short of your inspection plan at inspection characteristic level?

As per below screen,

Sandip