Sample results to one inspection lot

former_member303755
Participant
0 Kudos

Hi,

Please confirm if the following is possible:

Record result for samples say 5 samples by today and then assign those sample result to one inspection lots after one week.

It yes then how ?

Regards

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member211676
Contributor
0 Kudos

Hi Sun

First we need inspection lots to enter the results. If you mean five inspection lots results want to enter in one inspection lot. As per my knowledge it is not possible for transferring multiple result values to one inspection lot.

If you want to transfer one inspection lot to another please go through below link.

http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/60221c69-0f8b-2b10-eebf-bec51a601...

Regards

Kesava

Former Member
0 Kudos

Please give us the business need for capturing Inspection results for 5 samples & transferring that to inspection lot after one week.

In SAP, without Inspection lot, you can't record the results.