on 02-25-2014 3:33 PM
If an assembly is declared scrap and if many components that have gone into it are in good condition and have to be taken back into unrestricted stock. please suggest how to achieve this ?
Hi,
Check As-Built Configuration activity and its activity rules. Though you need to test if it actually allows to work with scrapped SFCs. If no - maybe you should consider removing components before scrapping.
Br,
KC
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi, Sreekaantha S
In my opinion, You can have several ways to treat it, I'll give you two:
First: Generate the assembly scrap, also do the cancelation of the components (movement type: 262). All movements linked to production order
Second: Generate the assembly scrap. And create a second production order to disassemble the assembly scrap
tks
Dimas Faria
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Dimas,
I am a new user of SAP pp.
Thanks fo the inputs. PLease help me on further doubts on above two suggestions
Assuming there are 10 pcs and 10 operations and I am doing CO11N for operation 6. I do not want to continue further operations for 3 pcs because of rejection. I would like to dissassemble and understand how many of the components used in this pcs is useworthy. Such components - I would like to take back to unrestricted stock. Few may not be in reuse condition also. Such components - I would I would like scrap. PLease help with flow of transaction codes.