on 02-25-2014 11:28 AM
Hi,
I'm currently working on a BOP variant which requires to have an MBDAT filter criteria and with Backorders(Date/Time) in the confirmation situation tab ticked. However, i have read something on an article that there is a known issue when these two are enabled:
Is there any other possible way to have BOP select the correct range according to the MBDAT criteria and with the Backorders ticked? Or if there is some other factor that can be considered (i.e. MBDAT time in scheduling, etc.)
I have tried all possible combinations for the conditions of my MBDAT filter criteria, however, there are still orders that are captured even if they shouldn't have been captured. I have also tried changing the times (GI Time, Loading Time, etc.) in schedule line data to see if it will reflect in /SAPAPO/SCHEDLIN, and still had no luck.
Your inputs are very much appreciated.
Thanks,
Bernhardt
Hi Berhardt
I hadn't seen this before.
Why don't you have two consecutive bop runs? one that just selects and reschedule back orders into the future, that should be quick, then another that includes your date range?
Mike
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.