cancel
Showing results for 
Search instead for 
Did you mean: 

SAP AFS - Batch number from allocation run

Former Member
0 Kudos

Hello colleagues,

In SAP AFS 6.5, when running the allocation run, SAP attributes a batch number to the sales order schedule lines. This hard link will be used later on during delivery creation & cannot be changed manually.

We are looking for a way to change this batch number, as in the warehouse, one is not always following the FIFO principle. The warehouse clerck can decide not to pick the allocated batch by applying "intelligent FIFO". E.g. customer orders 10 PC. 1 full box contains 10 PC

  • IF there is half a box (5PC) of batch A still available, and plenty complete boxes of batch B, then one will pick 1 full box of batch B (instead of losing time and mixing 2 batches in 1 box)
  • IF it appears that the full box with batch number A is at the bottom of a pallet, the clerck will pick a box from top in order not to loose time by moving all boxes.

It is thus decided at hoc in the warehouse whether one can follow the allocated batchnumber or not.

It is not an option not to use "discrete batchnumber" as we need the batchnumbers for tracing

Situation as is: Arun is master, Warehouse is slave

The desired situation to be: Arun is master, but Warehouse can overrule:

* Arun still provides the batch number for Warehouse as "desired situation"

* But that Warehouse can decide during picking not to follow the Arun, and thus overwrite the provided batch number

Can someone help me out on this topic as we are pretty stuck here.

How can we overrule this master/slave relationship?

looking forward reading your suggestions.

KR,

PEter

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hello,

Anyone who can help me out on this topic?

Grtz,

Peter

Former Member
0 Kudos

Hello,

We are having exactly the same problem.

Have you made any progress in getting this solved?

Thanks!

Best regards,

Peter