on 02-13-2014 4:46 PM
Hi
Could you please guide me on below issue
SAP PM order
Initially PRTs Column were showing in PM order in operation tab when I assigned PRTs (PRT as document) for operation. but now a days I am finding PRTs Column are not displaying in operation tab even though PRT are assigned in operation.
Could you please guide me what parameter I need to check for re appear PRTs Column in operation Tab.
That order type is planned order. Order generating through maintenance plan
Please help me on this issue (please refer below screen shot)
Thanks in Advance
Prashant
Click Configuration button right top of Operation tab matrix. Check the settings maintained there.
PRT column might have been set as Invisible.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Maheswaran
Greetings of the day
first of all thank you for given me your precious time on this issue. but i am facing problem , I have no authorization for changing in stranded layout or i cant create new layout.
Is there any way , I can change standard layout by customization ? If yes please give me path for customization
Thanks in Advance
Hi ,
Options 1:
You can find out who has changed this setting through table TCVIEW and asking that user to revert the changes. Go To Se16 ,enter table TCVIEW and the input the fields as below,
Program name= SAPLCOVG
Control = TCTRL_3010
Field Name=AFVGD-FLG_FHM
You will get the user under User Name Column
Option 2:
Taking the firefighter ID with the required authorizations and changing the setting in production
Thanks
Girish
User | Count |
---|---|
96 | |
10 | |
9 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.