on 02-12-2014 2:45 PM
Hi Experts,
We are using Ecc 6.0 ehp-4, SAP Basis 700 level 22, kernel 710 uc patch 223 and it is connected with SAP CCS, DB Oracle 10g ver 10.2.0.5.0, OS Windows 2008 R2 SP -1, please help me how could I schedule the redo log backup every 15 mins and weekly full backup automatically, I am trying to use DB13 but its not working even no log files, but through brtools its working properly, please help me how to automate the backup strategy process is there any parameters I need to change in int<SID>.ora.
.Thank you
Rahul
do you want to take backup to tape / disk? have you configured the init<SID>.sap accordingly and correctly? in DB13 you should be able to configure the log backup and the database backup separately or database backup + redo log backup.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
thank you for your reply we want to take the backup using tape please help me which parameters need to change I changed the backup type to tape but still not working and one more doubt that if we are taking redo log backup every 15 mins then again the daily incremental backup is required or not please help.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.