cancel
Showing results for 
Search instead for 
Did you mean: 

Production ECC to Quality PI

ajeyagv
Participant
0 Kudos

Hello All SAP PI Experts,

We faced some errors while performing a scenario. The scenario involved IDoc to File. All of these were conducted in production environments ie, IDocs were sent from Prod ECC system to Production PI system and from there to Production ECC system. But we found some IDocs were being missed from processing. All IDocs would reach the PI system and IE would process them successfully but when those processed messages were being sent  to AE, a few of them ( one or two) would get missed being transferred and as a result of that the receiver would receive less number of messages than was expected. So we contacted SAP team and inorder to solve this issue, they asked us to send the IDocs simultaneously to both production and quality PI system and they will try to find the reason behind the issue in quality system.

Now my question is, we need to create the same scenario in quality PI system. But we have to establish connection between the Production ECC sender system and quality PI system and also quality PI system to another Production ECC system. Is that possible ? Can we set up a connection between production and quality system ? If yes, how and what precautions do we have to take while performing this ?

Kindly help with this issue.

Thanks,

Ajeya

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member191435
Contributor
0 Kudos

Hi Vaani,

Can you please maintain queue in QA system and check the idocs based on that queue.

for this you have maintain queue in idxqueue table...

Thanks,

Sreenivas

Former Member
0 Kudos

Hello,

You can add another system into Application system (Prod system in your case) by going to SXMB_ADM and doing Integration Engine configuration.

Regards

ajeyagv
Participant
0 Kudos

u mean go to application system of prod ecc system and do integration engine config for quality xi. right ?

former_member184720
Active Contributor
0 Kudos

Hi Ajeya - Did SAP really asked you to configure the connection b/w Production ECC and Quality PI just to analyze this issue?? It definetly possible.

If it was proxy configuration then you might have to add another IS_URL and all but for IDOC's i think it would be simple..

  • SM59 : Create a RFC destination to PI Quality System
  • WE21 : Create a TRFC Port ->Specify the RFC Destination Created
  • BD54 : Create a Logical System for PI Quality System
  • WE20 : Create Partner Profile ->Maintain Outbound and the Inbound Parameters

Please note that you have to schedule a separate job to trigger the IDOC's to quality system as it's a different port.