on 02-05-2014 7:35 PM
Hello everyone,
I'm planning an EHP6 for SAP ERP 6.0. In the whole landscape there is also NW BW 7.0 and PI 7.0 solutions.
I was checking SAP Note 1043047 that state the following:
"For PI, it is a prerequisite that no other system in the system landscape has a higher release than the PI system”
Do I need to perform PI Upgrade first? I was checking with UDA tool and there's no problem about it (only with EHP7)
I was also checking SAP Note 1388258 that state:
" Application driven software updates:
There is also an attachment (Adjusted Version Interoperability.pdf) in the same SAP note. So, does this mean that PI have to be at least in release 7.0 SP19?
Has anyone tried this scenario?, is there any consideration?
Regards,
JAM
Hello
I had a quick check on the SAP note 1043047 - Compatibility of XI/PI in the system landscape
and there are two exceptions and one of them is this:
If the application does not use any new XI/PI functionality, it is technically possible to run an application system with a higher release than the PI system. For this reason, the combination with an older PI system can only be released by the applications themselves in addition to the general rule. These specific releases will be listed in note 1388258
Do you satisfy this condition ?
I also checked the UDA tool and I don't see an issue there too.
Until EHP6 there isn't any problem with the connected systems but there are restrictions from EHP7.
I would get the system upgraded to EHP6.
Regards
RB
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Jam
The compatibility between the existing PI and the ECC system to be upgraded to EHP6 system should only be questioned if they both are integrated. If not I don't think you need to worry much.
Whether the upgraded ECC system will be able to function properly without any compatibility issues with the PI system is what the exception from the SAP note means to me.
If the upgraded ECC system does not require any new PI functionality then it should be alright.
Like Yves said from EHP7 onward's there are requirements to have the other connected systems like PI, BW to get upgraded to higher release before the ECC gets upgraded.
I go with the UDA than the SAP notes. SAP notes mostly lacks clarity.
But if you need a concrete answer then I would suggest you to put an OSS message and get this clarified.
Regards
RB
Hi
I've upgraded 3 years ago an ERP 4.7 to ECC6 Ehp4 (basis 701) that system was connected to an XI 7.0 SP22 and there was no problem. It may depend on the usage of the PI system.
I confirm that the compatibility problems are really coming with Ehp7 ()
For the BW system there should be no issue.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.