cancel
Showing results for 
Search instead for 
Did you mean: 

TDMS for BW System

Former Member
0 Kudos


Hi ALL ,

We would like to implement TDMS 4.0 among our BW Landscape , please share BW specific document and suggest about Process type ( time based, shell creation etc ) to execute and brief the considerations to use process type in particular to BI systems?

our BI systems stands on SAPBASIS 701, Oracle 11, and OS linux.

Thanks,

Sankar Bavirisetti

Accepted Solutions (0)

Answers (1)

Answers (1)

nirmal_konchada
Active Contributor
0 Kudos

Hello Sankar,

Although I have not build a BW system using TDMS 4.0, I have found a post about TDMS on SAP BW.

http://scn.sap.com/thread/1697835

and also you can refer to SAP note 1611700 for the pre-requisites.

For SAP BW following migration scenarios are available-

Shell Creation for SAP BW

  • SAP TDMS transfers all repository objects such as reports, DDIC structures, and table definitions.

Time-Based Reduction for SAP NetWeaver BW

  • SAP TDMS reduces BW transactional data based on the time slice

Regards,

Nirmal.K

Former Member
0 Kudos

Hi All,

In particular to BI uses following TDMS migration solutions

1. Syetem Shell Creation

2. File transfer

3. Time based reducations

Thanks,

Sankar