cancel
Showing results for 
Search instead for 
Did you mean: 

Dynamically update tvarvc variable with last day of month from variable business day

Former Member
0 Kudos

All,

A user wants to find a way to update a date parameter within a Z report automatically. This report is supposed to capture YTD from the 1/1/20XX to the last day of the previous month. Additionally, this report is run on the 4th business day of the following month.

I had thought I could set up a sy-datum-based parameter for the upper and lower limits but not sure if this is possible since the report run date may vary (i.e., you can't use 'sy-datum -4' on the 4th day of the month you are running the report since that 4th day won't always be a 'business' day).

Any advice on how to proceed with this? Is RS_CHANGE_CREATED_VARIANT an option? I would like to find a solution requiring nothing more than updating the TVARVC table.

Thanks!

Pete


Accepted Solutions (0)

Answers (1)

Answers (1)

krscheffler
Advisor
Advisor
0 Kudos

Hello Pete,

Please post your query in the correct topic space in SCN.  For help, see this document:

Find Topic Spaces on SCN (Forums)

Thanks,

Kristen