cancel
Showing results for 
Search instead for 
Did you mean: 

Auto UD not happening for SKIP lots

Former Member
0 Kudos

Hi Experts,

Iam trying to implement skip lot. Used DMR for lot creation. All are working fine but the Skipped lots cannot be made UD. All are in SKP status.

Tried using QA17 for making automatic UD but it is not working. Delay time made to 0 for testing purpose. Kindly advice your suggestion.

 

Regards,

VSR

Accepted Solutions (0)

Answers (4)

Answers (4)

former_member42743
Active Contributor
0 Kudos

Please check the variant of the auto UD program itself.

Make sure that the indicator "Include skip lots" is ticked on.

I assume you have manually made a UD with no problems, no pop ups, warning messages or errors?

Craig

former_member184536
Active Contributor
0 Kudos

Hi

Please check following things

1) Check varaint carefully how it was scheduled.

2) Delay time for skip lot at plant level setting in config.

3)Waiting time for Auto UD at plant level setting

4)Check Auto UD indicator is set for inspection type of  materials.

Regards

Manish

former_member221025
Active Contributor
0 Kudos

HI VSR,

1. Check variant in QA16 again.

2. Be little bit patient by setting delay time as 1 minute.

3. If everything seems ok then send screenshots of an inspection type maintained in Qm setup and variant in QA16.

Amol.

Former Member
0 Kudos

Hi All,

Auto UD enabled in Material master. DMR assigned to Material master & Inspection plan (Dynamic modification @ lot level).

When using QA16 system says Results are not confirmed So, UD code “A” not possible.

Kindly advice.

VSR.

nitin_jinagal
Active Contributor
0 Kudos

Hi,

'Result are not confirmed'.Pl check if

  • All Required MIC are closed and valuated as Accepted.
  • None of them is valuated as Reject or any defect has not been recorded.

These are few mandate conditions which should be fulfilled for Auto UD to take place.

ntn

Former Member
0 Kudos

Hi NTN,

Status for the MIC of SKIP lot shows 4 (SKIP). Is there any auto std program to update the process completion (change the status to 5 - Processing is completed).

With this status change we will be able to do QA16 / QA17.

Regards,

VSR.

Former Member
0 Kudos

Maintain waiting time in plant level setting

1. in qm inspection setup- inspection type activate 'Auto UD ' and Skip allowed'

2. in inspection plan header maintain dmr at lot level. if possible maintain all char's as optional char.

3. in QA17, Maintain will creating variant.

4. schdule as per ur requirement.

Former Member
0 Kudos

Hi,

Inspection setup type already set with the above requirements.

DMR also maintained.

Issue is also with doing the UD manually - Results are not confirmed So, UD code “A” not possible

By manually when we FORCE the characteristics Status becomes 5 & Auto UD works.

Former Member
0 Kudos

Check whether any the insp. chars is required?

Check the valuation mode : whether it is manual ?

This can be reason for Results are not confirmed So, UD code “A” not possible


Is there any enhancement done or user status profile used?

Former Member
0 Kudos

Hi,

No enhancements  done. Testing for std cases only. When verifying the Sampling procedure it had manual valuation. Advice setting to be made,

Former Member
0 Kudos

Hi Experts,

Advice on the solution to resolve the issue.

VSR

Former Member
0 Kudos

If possible change the Characteristics to Option char (control indicator).

nitin_jinagal
Active Contributor
0 Kudos

Hi,

What is the dynamic modification you have maintained in the DMR? Pl check this in the initial screen of DMR.

Other than that, have you run a check as per my last post? Make sure there is no defect recording, no rejected MIC, no notification in the previous inspection lot.

ntn

nitin_jinagal
Active Contributor
0 Kudos

Hi,

If all your mentioned settings are correct, then have you looked at material master QM view for this material (s)?

Pl check that indicator for 'Auto UD' is set for the inspection type of this material.

ntn