Sloc needs to be excluded from MRP and backflush should happen from exculed Sloc

Hi All,

Consider there is a finished material A , under A i have a component B [ procurment type = F]

B has Slocs 0001,0002.

Now I have to exclude the sloc from 0001 from MRP,but while doing backflush the sloc 0001 needs to be considered for component consumption.

And for MRP planning I will be using sloc 0002 .

For acheving the above scenario , i have marked sloc 0001 for material B excluded from MRP via Tcode MMSC.

And I have assigned stock determination group [ consumption form sloc 0002 ] for the material B.

Now when I run the MRP , recepits for the material are getting created w.r.t to sloc 0002 , but Backflush is also considerding 0002 which is not desired .

Can some one guide me how to achieve the above scenario




Hi Sireesha,

I can see below options.

  • Make stock determination strategy with storage location 0001 and with priority1. Exclude st loc 0001 from MRP (you have already done).Check if it works (Not very sure)
  • Manually change the storage location at the time of goods movement.
  • Use exit PPCO0005  Storage location/backflushing when order is created
  • Change in BOM item level as st loc 0001



1 View this answer in context