Hi All,
Consider there is a finished material A , under A i have a component B [ procurment type = F]
B has Slocs 0001,0002.
Now I have to exclude the sloc from 0001 from MRP,but while doing backflush the sloc 0001 needs to be considered for component consumption.
And for MRP planning I will be using sloc 0002 .
For acheving the above scenario , i have marked sloc 0001 for material B excluded from MRP via Tcode MMSC.
And I have assigned stock determination group [ consumption form sloc 0002 ] for the material B.
Now when I run the MRP , recepits for the material are getting created w.r.t to sloc 0002 , but Backflush is also considerding 0002 which is not desired .
Can some one guide me how to achieve the above scenario
Thanks
Sireesha
Hi Sireesha,
If you are using stock determination group and system picks the material from that storage location, backflush will also have from the same storage location.
My question is why to backflush from a storage location where the stock is not planned? If you are using 0002 for planning, I assume stock receipt will be there. As well logically issue should be from there itself.
Backflush you can maintain in different places but stock will be consumed from the issue storage location.
Please refer the document if it helps.
http://scn.sap.com/community/erp/manufacturing-pp/blog/2013/12/30/backflush-and-its-priority-in-use
I feel you have to change the storage location manually.
Regards,
Krishnendu.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sireesha,
I can see below options.
Regards,
Krishnendu.
Hi,
You can implement customer exit PPCO0005 to manipulate component's storage location of production orders. You can assign export parameter STRLC_E depending on the conditions of your choice in th e user exit. Please try and revert.
Regards.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi Mangalraj ,
I have done the suggestec changes , it is considering the sloc 0001 for component B .
But though the stock is availble , and sitting as a backlog in MF47 .
when I remove the stock determination group from material master its working fine .
But I need the stock determination group because , the recepits of the component B should consider 0002.
Thanks
Sireesha
Dear Sireesha,
Still unable to connect the dots as why you want to use the Stock determination group?
As I suggested maintain the production storage location 0001 in the BOM of product A for component
B and remove the stock determination group and check both MRP effect and the backflush storage
location and come back with your queries.
Regards
Mangalraj.S
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.