Hi,
There is a Urgent requirement user want to edit the production planned key figure in SNP planning book. I found suitable link but it is not clear to solve the issue. We are getting the following error.
link:http://scn.sap.com/message/7252711
Generation error in TSTR_PERIODS_FACTORYCALENDAR
Message no. T9506
Diagnosis
An error has occurred in the generation program for the time stream.
System Response
System termination.
Procedure
Contact the system administrator.
Thanks in advance.
Regards,
Lingaiah
Hi Lingaiah,
This is usually caused by a factory calendar that is not maintained far enough into the future. Use transaction SCAL (or /SAPAPO/CALENDAR in the APO system) to maintain the factory calendar (or planning calendar) which the time streams are based on at least three years into the future or beyond the planning horizon.
Couple of checks,
The validity start date of the PDS is in the future.
The product has a goods receipt processing time.
The validity start of the PPM/PDS is before the generation period of the time stream.
Also refer the OSS note 1741443 - PDS validity in the future and GR processing time
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Check if the Factory Calendar associated with the Location and Resource has a validity date beyond your planning horizon.
Also ensure that the program /SAPAPO/CRES_CAPACITY_LENGTHEN has been executed for your resources.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.