Hi,
have anybody an idea why I always have to select the phase, to start with the result recording?
My setting:
- inspection type 03 in master data
- inspection plan is assigned to recipe
- within my recipe I have one operation & and one phase (the production version is only using the phase, due tp PP-PI settings) the characterisitcs are assigned to my phase.
Doese anybody know why I always have to confirm the phase, before I can start with result recording?
Thanks a lot
Maike
Hi,
for me you have insert in both operation control key QM01 o QM02 . You must insert QM02 only in sub-operation (phase 0020).
Regads
Gius
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Any operation or phase you are creating is defined as QM active or not depending on the control key you are selecting for that operation, So depending on the control key you selected for the operation, it will show as QM active for that operation & QM char will be defined in that operation only.
Thanks
Sachin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I thought, that with the Controll Key we only make sure that inspection results are recorded before the confirmation of the process order is possible! Because during testing I got an error message "confirmation not possible, because no results recorded". I think the Controll Key has no impact during result recording (that I always have to select the phase, where the characteristcs are assigned).
cheers
Maike
HI,
Yes you always have to Select the Phases that you want to record &
"confirmation not possible, because no results recorded" are maintained in Parameter for Order Confi. (Tcode OPK4). So that when you doesn't record the result, System will give you error at the time of Confirmation.
Check the Screen Shot for setting....
Hello Koster,
IN the process of In-process inspection, There may be multiple production operations and some operation may require inspection. IN the SAP , for the In-process inspection , there is always a single inspection lot to record the result. Therefore , we need to declare, that for which stage of production operation , this inspection is being done.
Neeraj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Sure..
1) you can have characteristics on multiple phases
2) you may decided to manually add a test to a phase that may not have any pre-assigned.
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
94 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.