cancel
Showing results for 
Search instead for 
Did you mean: 

in variant configuration how price will determine for two variant separately in to the SO

Former Member
0 Kudos

Hi

friends

One material two characteristics in variant configuration, how price will determine for these two characteristics values separately in to the sales order. please help me.

Accepted Solutions (0)

Answers (3)

Answers (3)

Lakshmipathi
Active Contributor
0 Kudos

Moved from SAP ERP Sales and Distribution (SAP SD) to SAP ERP PLM - Classification and Variant Configuration.  Please post all your VC related queries here.

G. Lakshmipathi

keyur_mistry1
Active Participant
0 Kudos

Assuming that you have correct pricing configuration, for characteristics price. (Table SDCOM and filed name VKOND)

1. For variant price we have std condition type VA00.

2. Copy & rename it.

3. You have two cstics right? If both cstics is price dependent then u can combine both word and make single value, That you can assign to cstics price and make condition record for that. (VK12).

Note: First make excel work for your price combination, then make condition record.

It will trigger at your sales order level

Case - 2.

If you want a separate price for the both cstics. u can create two condition type from the VA00 and maintain condition record for this.

If you don't have cstics price, plus maintain it.

For more idea post your doubt step by step. (with one one question) it will get clear and trigger.

Former Member
0 Kudos

Hi BK DAS,

Please ensure first that your basic VC setup is ready for pricing - use the following document as your reference (starting page 211): http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf

Standard SAP proposes two condition types for variant pricing:

VA00 - for upcharges/reductions in absolute amounts ($)

VA01 - for upcharges/reductions in %

You can copy these condition types - Ex.

ZA01 - upcharge characteristics 1

ZA02 - upcharge characteristics 2

Include these conditions in your pricing procedure.

Then in VK11 you maintain the values of characteristics 1 with the according upcharges/reduction for ZA01. And you do the same for characteristics 2 for ZA02.

Bernhard